Parking Structure
Removal Project in Syracuse
Concrete Cutting and Breaking, Inc. - Grand Rapids, Michigan
- was hired to complete a parking structure renovation project
in Syracuse, New York. This project consisted of removing
three levels of a parking deck in Syracuse at the MONY Bank
location. The structure was determined to be unsafe after
a section collapsed and crushed a number of cars below.
Slab sawing was determined to be the
safest method of removal since there were working offices
below and a glass office building approximately two feet away.
The other three sides were closely hemmed in by streets, as
is typical in downtown settings of older cities. The structure
was cast-in-place concrete with 5/8" rebar in the slabs
on 12" centers, and the 30" diameter columns with
1-1/4" rebars on 6" centers, plus five 2 1/2"
rebars in each.
Besides the three levels of deck,
there was an elevator and staircase to be removed. These had
to be cut with a wall saw and removed piece by piece with
a crane. Each level had a 3' to 4' parapet wall around the
perimeter which was 12" thick. The slab was 10-1/2"
to 24" thick, creating a need for a variety of cutting
techniques.
Three cranes were staged around the
structure so that the lifting of pieces could be continuous.
First, the walls were cut into sections with a parapet saw
and then they were severed from the deck. Next, the deck was
cut one bay at a time and removed via crane. Lastly, the columns
were cut off with a curb saw and removed. The work progressed
from the outside in to the center, so that the cranes would
have room to reach within their boom. CCB had as many as six
saws cutting at one time.
The total cutting of this job included:
- 172 30" diameter columns
- 156 3' by 12" parapet wall
cuts
- 90 4' by 12" parapet wall
cuts
- 604' of 8" wall sawing
- 250' of 12" wall sawing
- 3,048' of 8" slab sawing
- 24,476' of 10-1/2" slab sawing
- 3,058' of 15" slab sawing
- 933' of 18" to 24" slab
sawing
 |
| Slab
sawing the outer deck area for removal. |
back to top
|
 |
| The
Syracuse Parking Garage project begins. |
 |
| Three
cranes were staged around the structure for easy removal
of the sections. |
back to top
 |
| Slab
sawing a deck section. |
 |
| Deck
sections removed, awaiting column cuts. |
back to top
|